Flagship Project — Salta Province

Rio Grande

Large gold-copper-silver porphyry project with a 2026 NI 43-101 mineral resource estimate and located 10km from the operating Lindero gold-copper mine (Fortuna Mining Corp.) in Salta, Argentina

Overview

Introduction

Centauri’s Rio Grande Gold-Copper Project is located in the Altiplano of northwest Argentina at elevations between 3,700 to 4,700 metres above sea level. It is located approximately 250 km west of the city of Salta and 40 km east of the Chilean border. The project is situated approximately 8 km west of the operating Lindero gold-copper mine (Fortuna Mining Corp., TSX: FVI, NYSE: FSM), which began operations in 2020, and is in close proximity to a number of notable mines, projects, as well as industrial scale solar power plants and regional infrastructure that support a sparsely populated mining region.

Various exploration programs were carried out at the project from the mid-1990s, with the discovery of the deposit in 1999 from surface rock samples, to the last drilling campaign which ended in 2013. Regulus Resources Inc. (TSXV: REG) and its predecessor companies worked on the property from 2004 to 2012 which resulted in an initial Mineral Resource estimate completed in 2012. Regulus then completed a spin-out of the project as part of a portfolio of projects in Argentina into Aldebaran Resources Inc. (TSXV: ALDE) in 2018.

To date, 129 holes totalling approximately 74,201 m have been drilled at the project. No drilling or exploration programs have been conducted on the >17,000 hectare property since 2013. The Mineral Resource estimate prepared by SLR International Corporation for the Rio Grande Project as of February 15, 2026, is summarized in the following table:

Project Facts

  • Ownership: 100% Centauri
  • Province: Salta, Argentina
  • Geology: Gold-Copper-Silver porphyry system (past interpretations as IOCG)
  • Status: Exploration with historical resources
  • Elevation: 3,700 to 4,700 masl
  • Discovery: 1999 from surface rock samples
  • Total Drilling: 74,201 metres (last in 2013)
  • Mineral Resource Estimate: April 2026 NI 43-101 Technical Report by SLR International Corporation
  • Proximity to Nearby Mines/Projects: Lindero (10 km, Fortuna Mining Corp.), Taca Taca (45 km, First Quantum Minerals Ltd.), Escondida (145 km, BHP-Rio Tinto-JECO)
Target Metals
Au · Cu · Ag
Gold · Copper · Silver

Summary of Mineral Resources – February 15, 2026

Category Material Type Tonnes (Mt) Grade Contained Metal
Au (g/t) Cu (%) Ag (g/t) Au (koz) Cu (kt) Ag (Moz)
Indicated Oxide 94.1 0.26 0.20 2.1 781 188 6.3
Transition 47.3 0.34 0.33 3.6 523 156 5.5
Sulphide 12.3 0.36 0.29 2.3 144 36 0.9
Indicated Total 153.7 0.29 0.25 2.6 1,448 384 12.7
Inferred Oxide 144.5 0.19 0.16 2.2 898 231 10.3
Transition 75.6 0.26 0.24 3.0 643 181 7.4
Sulphide 0.7 0.25 0.24 4.1 6 2 0.1
Inferred Total 220.8 0.22 0.19 2.5 1,547 420 17.8
Notes
  1. CIM (2014) definitions were followed for Mineral Resources.
  2. Mineral Resources are reported within a preliminary open pit resource shell.
  3. The quantity and grade of reported Inferred Mineral Resources in the updated Mineral Resource estimate are uncertain in nature and there has been insufficient exploration to define these Inferred Mineral Resources as Indicated Mineral Resources. However, it is reasonably expected that the majority of Inferred Mineral Resources could be upgraded to Indicated Mineral Resources with continued exploration.
  4. Mineral Resources are estimated at a net smelter return (NSR) cut-off grade of US$10.25/t for oxide, US$15.00/t for transition, and US$9.50/t for sulphide material.
  5. Mineral Resources are estimated using a long-term gold price of US$3,000 per ounce, copper price of US$4.50 per pound, and silver price of US$45 per ounce.
  6. Metallurgical recoveries vary from 83% to 90% for gold, 29% to 64% for copper, and 0% to 41% for silver.
  7. Bulk density is 2.41 t/m³ for oxide, 2.50 t/m³ for transition, and 2.62 t/m³ for sulphide mineralization.
  8. Numbers may not add due to rounding.

Source: NI 43-101 Technical Report prepared for Centauri Minerals Inc. and Aldebaran Resources Inc. by SLR International Corporation, titled “Rio Grande Project Mineral Resource Estimate, Salta Province, Argentina”, dated April 16, 2026. The Technical Report was filed by Aldebaran Resources Inc. and is available publicly on SEDAR+.

Documentation

Technical Reports

NI 43-101 technical reports and related documentation for the Rio Grande project.

NI 43-101 technical reports and related documentation for the Rio Grande project can be accessed on SEDAR+ under filings by Aldebaran Resources Inc.
View on SEDAR+

Gallery

Photos


Portfolio

Explore Other Projects

Gold · Silver  •  Jujuy Province

Aguas Calientes

View Project →
Cu  •  Jujuy Province

Catua

View Project →
Copper · Gold  •  Salta Province

El Camino

View Project →

Data Source Disclaimer: Geological, drilling, resource estimate, and exploration history data on this page has been sourced from publicly available materials originally published by Aldebaran Resources Inc. and predecessor companies including Regulus Resources Inc., Antares Minerals Inc., Pachamama Resources Inc., and Mansfield Minerals Inc. The current Mineral Resource Estimate is documented in the NI 43-101 Technical Report prepared for Centauri Minerals Inc. and Aldebaran Resources Inc. by SLR International Corporation, titled “Rio Grande Project Mineral Resource Estimate, Salta Province, Argentina”, dated April 16, 2026, filed by Aldebaran Resources Inc. and available publicly on SEDAR+. Centauri Minerals makes no representations regarding the accuracy or completeness of historical third-party data. For the most current technical information, please refer to Centauri Minerals' own filings and technical reports as they become available.